Home   /   Projects   /   Residential   /   River Crest, Rudrapur
River Crest, Rudrapur
Welcome to River Crest, Rudrapur
Starts From
Rs. 13,16,000
Location
Rudrapur, Pant Nagar ( U.K)
EMI Starts from
Rs. 12,000
PROJECT STATUS
Under Construction


Rudrapur is a growing city in several ways. Many multi-national brands vouch for the place and plan to expand furthermore. The residential sector is also blooming with world-class developments like Supertech RiverCrest, a 24 acre metropolitan township. Come, enjoy riverside living and be surrounded by scenic beauty.


Loans Approved by

 

Sales Office
Supertech RiverCrest
Rudrapur

 

Features
What's Special

Clubhouse

Coffee Bar

Gymnasium

Parking

Swimming Pool

CCTV Surveillance

Play Area

Hi-speed Elevators

Power Back-up

Open Landscape

Jogging Track

Party Lawn
  • 24 acre luxurious township
  • Pleasant splendors of riverside view
  • Exclusive Club with swimming pool
  • Landscaped greens with water bodies
  • Gated complex with advanced security systems
  • Well-planned roads, paved walkways and tree-lined avenues
  • Underground sewage treatment plant
  • High-end specifications
  • Situated along NH-87
  • Round the clock power back up and water supply
  • Land allotted by SIDCUL Authority
  • Well connected to New Delhi
  • 15 minutes drive from Airport and Railway Station
  • In close proximity to Metropolis Mall, Radisson Blu and Metroplois City
Media Gallery
Get Direction
Site Plan
Roll Over to Enlarge
Floor Plans
1 BHK

Drawing Room
10'-6"x12'-0"

Bedroom Room
10'-0"x10'-6"

Kitchen
5'-0"x7'-0"

1 Bathroom
4'-0"x4'-0"

2 Balconies
5'-0" WD

1 Toilet
4'-0"x4'-0"
Studio 620 sq.ft
Super Area - 620 sq.ft

Living/Bedroom
8'-6" x 9'

Kitchen
8'-6"x 8'

Bedroom
8'6"x 11'9"

1 Toilet
7'-3"x 5'

1 Balcony
12'-5' Wide Balcony
Specifications
Flooring
Marble/tiles in living & dining rooms. Wooden flooring in master bedroom. Vitrified tiles in all the bedrooms. Anti-skid tiles in the balcony.
Wall & Ceiling Finish
POP/Gypsum plaster finished walls & ceiling with OBD.
Kitchen
Marble on the working top & 2' high wall dado.
Toilets
Granite counter washbasin. All toilets will have ceramic floor & wall tiles up to 7" height, balance painted in acrylic emulsion paint. Premium quality sanitaryware. Wall hung WC and washbasin in matching shades/colors. Single lever C.P. fitting. All the toilets will include exhaust fan, mirror, towel rack, rod & ring accessories.
Plumbing
Pressurized water supply system. Copper piping for water supply inside the toilet and kitchen & UPVC pipes for stacks.
Electrical
Modular range switches sockets MCBs, copper wiring. Two wall light fixtures in each living, dining lobby and bedroom area.
Doors and Windows
Main Entrance: 8' high entrance door with polished hardwood frame
Internal Door: Seasoned hardwood frame
Window: UPVC windows
Communication
TV and telephone points
Air Conditioning
Only provision of AC points in bedrooms, drawing & dining area.
Security
Secured gated community
Price List
[A] Construction Link/Special Payment Plan
Category Super Area sq.ft. BSP (Per sq.ft.) Total Cost (in Rupee)
1 BHK57025001425000
2 BHK97525002437500
3 BHK114025002850000
[B] Down Payment Plan
  Super Area sq.ft. BSP (Per sq.ft.) Total Cost (in Rupee)
1 BHK57023001311000
2 BHK97523002242000
3 BHK114023002622000
[A] Basic Sales Price
TypePlot SizeB.S.P (22500/Sq.Yard)
VillaSq.YdINR
A1503375000
B2004500000
C2505625000
D2756187500
E3257312500
[B] Other Charges
Particulars Cost
Particulars Cost
IFMS Rs. 50 Per Sq.ft.
EDC / IDC Free of Cost
Clup Membership(optional) Rs. 50000 /-
Open car parking Included in BSP
PB/EI/MI (Upto 2 KW & 1) Rs 85000
[C] Preferential Location Charges
Particulars Cost
Corner PLC 5%
Park Facing PLC 5%
Both Corner & park Facing 7.5%
[A] Basic Sales Price
Accommodation Type Down Payment Plan BSP @ Rs. 3000/sq.ft.
Studio (620 sq.ft.) Rs. 1860000
[B] Floor PLC
Ground Floor Rs 125 psf
First floor Rs 100 psf
Second Floor Rs 75 psf
Third Floor Rs 50 psf
Fouth Floor Rs 25 psf
Fifth Floor NIL
Sixth Floor NIL
Cornor PLC Rs 50 psf
[C] Other Charges
Particulars Cost
Particulars Cost
Open Car Parking Rs 50,000/- (Optional)
Club Membership Rs 50,000/- (Optional)
Interest Free Maintenance Security(IFMS) Rs 50 psf
EDC/IDC Rs 50 psf
Electrical Installation charges ( 2 KVA Mandatory) Rs 50000
Power Back up ( 1 KVA Mandatory) Rs 25000
Payment Plan
[A] Down Payment Plan
   
At The Time Of Booking10%
With In 45 days of Booking70%
On Offer of Possession20%
[B] Special Payment Plan
At The Time Of Booking 10%
With In 45 days of Booking 30%
on 10th floor slab casting 30%
On Offer of Possession 30%
[C] Additional Charges
   
Electricity installation charges 2 Kva 50000
Power Backup 25000
Club Membership Charge (optional) 50000
Stilled Car Paarking (optional) 200000
[D] Terms and Conditions
  • Cheques/Bank Draft to be issued in favour of 'SUPERTECH LIMITED' Payable at Rudrapur
  • Registration Stamp Duty shall be payable at the time of offer of possession.
  • All buildings plans, layouts, specifications are subject to modification as decided by the competent authority.
  • Timely payments of the installments are the essence of the Agreement.
  • On Delayed Payments Company will charge interest @2% Month for any delayed Period.
  • Service tax, Lease rent and excalation charge will be extra.
  • 1 sq meter = 10.764 sq feet
[A] Down Payment Plan
   
At The Time Of Booking 10%
With In 45 days of Booking 15%
On Offer of Possession/ at the time of sublease-Deed 75%
[B] Terms and Conditions
  • Cheques/Bank Draft to be issued in favour of 'SUPERTECH LIMITED' Payable at Rudrapur
  • Registration Stamp Duty & Lease rent shall be payable at the time of offer of possession.
  • All buildings plans, layouts, specifications are subject to changes & modification as per the company, architect or any other competent authority.
  • Timely payments are the essence of the Agreement otherwise Company will charge interest @2% Month
  • Service tax , Maintanence charge will be extra. (1 sq meter = 10.764 sq feet).
Payment Plan
At The Time of Booking10%
With In 45days of Booking70%
On offer of Possession20%
Terms and conditions
  • Cheques/Bank Draft to be issued in favour of 'SUPERTECH LIMITED' Payable at Rudrapur
  • Registration Stamp Duty shall be payable at the time of offer of possession.
  • All buildings plans, layouts, specifications are subject to modification as decided by the company, architect or competent authority.
  • Timely payments of the installments are the essence of the Agreement.
  • On Delayed Payments Company will charge interest @2% Month for any delayed Period.
  • Service tax , Lease rent and excalation charge will be extra.
  • 1 sq meter = 10.764 sq feet
Progress Status
Tower Current Status
Plots Under Offer of Possession
1 BHK (Tower – E) Structure Ready , internal Plaster complete , External Plaster start
Tower F Handover
Villa work on scheduled as per time
Villa (150 sqyd) 8,30,31 Handover
Villa (150 sqyd) 32,33,34,35 Finishing work start
Villa (200sqyd) 161,209 Handover
Villa (200sqyd) 208 Structure Ready
Villa (275 sqyd) 71 Handover
Villa (275 sqyd) 72 structure ready
Enquiry Form

I am interested in this project

spacer
spacer
Location Map

FOR ENQUIRY, CALL +91-93100-12345
Menu
×

Dear Customer





For any Query/Input/Feedback, Please contact - crm@supertechlimited.com
Corporate Office : E Square, Plot No C2, Sector-96, Noida, Uttar Pradesh-201303
close
  //