Home   /   Projects   /   Residential   /   Officer's Enclave, Gurgaon
Officer's Enclave, Gurgaon
About Officer’s Enclave
Starts From
5348750
Location
Sector 2, Sohna Road Gurgaon
EMI Starts from
40,000
PROJECT STATUS
Under Construction

Supertech presents Officer’s Enclave, a picture perfect home located inside its glorious project, Hill Town. Officer’s Enclave is an aordable living concept specially designed to redene living for retired or serving government ocials. It is an abode with excellent amenities in the ethereal vicinity of Gurgaon which shares entertainment centre, excellent healthcare facilities and reputed educational institutes.

Loans Approved by

 

Features
What's Special

Clubhouse

Coffee Bar

Gymnasium

Parking

Swimming Pool

CCTV Surveillance

Play Area

Hi-speed Elevators

Power Back-up

Open Landscape

Jogging Track

Party Lawn
  • Stunning views of the Aravalli range.
  • Part of lush 140 acre development.
  • Super sized rooms with well appointed windows.
  • Automatic boom barriers and CCTV.
  • Laminated wooden flooring in Master Bedroom.
  • Mini theatre for the weekend blockbusters.
  • Swimming pool with a separate kids pool.
  • Yoga & Meditation Pavilions.
  • Reading lounge cum library.
  • Multi-purpose party avenue.
  • Golf putting greens.
  • Jogging and cycling tracks.
  • Cricket avenues for your budding star.
  • Indoor games area with snooker, table tennis & much more.
Media Gallery
Click  
 to Get 360 degree view of construction site from various points
Get Direction
Site Plan
Roll Over to Enlarge
Floor Plans
Cluster Plans For Independent Floors [ 3 BHK + 2 Toilet Super Area - 1375 sq.ft./127.74 sq.mt. ]
Super Area - 1375 sq.ft./127.74 sq.mt.

3 Bedrooms
10'-6"x 11'-6"
11'-0"x 13'-10"
10'-0"x10'-0"

Drawing and Dining
24'-0"x11'-0"

Kitchen
11'-6"x7'-10"

2 Toilets

3 Balconies
Cluster Plans For Independent Floors [ 3 BHK + 3 Toilet Super Area - 1720 sq.ft./159.79 sq.mt. ]
Super Area - 1720 sq.ft./159.79 sq.mt.

3 Bedrooms
11'-0"x 14'-3"
11'-0"x 14'-3"
11'-0"x11'-6"

Drawing and Dining
27'-6"x13'-1"

Kitchen
10'-0"x7'-6"

3 Toilets

3 Balconies
Specifications
Structure
RCC / Load bearing structure with infill brick wall
Living / Dining Room / Drawing Room / Dressing Room
Floor: Vitrified Tiles
Walls: Oil Bound Distemper
Ceiling: Oil Bound Distemper
Master Bedroom
Floor: Laminated Wooden Flooring / Vitrified Tiles
Walls: Oil Bound Distemper
Ceiling: Oil Bound Distemper
Other bedroom(s)
Floor: Ceramic Tiles
Walls: Oil Bound Distemper
Ceiling: Oil Bound Distemper
Servant / Guest Bed /Utility Rooms
Floor: Ceramic Tiles
Walls: Oil Bound Distemper
Ceiling: Oil Bound Distemper
Doors
Internal doors: Flush Shutter with Wooden Frame
External Door And Window: Powder Coated Aluminium with Double Rebate
Electrical Fixture
Sheet and Switches
Toilet
Walls: Ceramic Tiles of 7’ height
Floor: Ceramic Tiles
Ceilings: False Ceiling
Kitchen
Walls: Ceramic Tiles of 2’ height from the platform
Floor: Vitrified Tiles
Ceilings: Oil Bound Distemper
Balcony
Floor: Ceramic Tiles
Walls & ceiling: Oil Bound Distemper
Ceilings: Permanent Paint Finish
Lifts For High Rise & Independent Floors
Floor: P.V.C. Flooring
Lobbies/Corridor
Floor: Kota Stone / Vitrified Tiles
Walls: Oil Bound Distemper
General
Hardware: All doors and windows with metal fittings along with
Electrical: Copper wiring and PVC concealed conduit. Provision for adequate light and power points
Water Supply:Underground and overhead water tanks with pumps and 24 hours water supply.
Price List
Price List for High Rise Floors
Floor Subvention BSP CLP BSP
Ground 4550 4250
1 4525 4225
2 4500 4200
3 4475 4175
4 4450 4150
5 4425 4125
6 4400 4100
7 4375 4075
8 4350 4050
9 4325 4025
10 4300 4000
11 4275 3975
12 4250 3950
13 4225 3925
14 4200 3900
15 4175 3875
16 4150 3850
17 4120 3820
18 4090 3790
19 4060 3760
20 4030 3730
21 4000 3700
22 3970 3670
23 3940 3640
24 3910 3610

Particulars Cost
Covered Parking (1 Mandatory)  3,00,000
Club Membership  Free of Cost
Power Back-up Charges (1 KWA included)  Free of Cost
Electricity Installation Charges (1 KWA included)  Free of Cost
Location/Facing PLCs  Free of Cost
Notes:  
1) IFMS – Rs. 50/- sq.ft. payable at the time of offer of possession.
2)  Subvention is till the offer of possession.
Price List for Independent Floors
  1st floor (above stilt) 2nd floor 3rd floor 4th floor
BSP - Construction Link Payment Plan 4350 4,200 4,050 3,890
BSP - Possession Link 40:60 Plan 4,500 4,350 4,200 4,040
Additional Charges
Particulars Cost
Car Parking 3,00,000/-
Electricity Installation Charges (1 KW Mandatory] Free of Cost
Power Back- up Charges (1 KW Mandatory] Free of Cost
Club Membership Free of Cost
Location PLC Corner, 18 Meter Road & Above Facing and Garden Facing
PLC 1 PLC 4%, 2 PLC 5%, 3 PLC 6%
IFMS Rs. 50/sq.ft. at the time of possession

 

 

 

 

Payment Plan
[A] Construction Linked Plan
On Booking  Booking amount as prescribed
  2 BHK - Rs. 3.5 lacs
  3 BHK - Rs. 4.5 lacs
Within 60 days  Complete 20% of BSP less Booking Amount
On Casting of Basement  10% of BSP
On Casting of Ground Floor  10% of BSP
On Casting of 3rd Floor  7.5% of BSP
On Casting of 6th Floor  7.5% of BSP
On Casting of 9th Floor  7.5% of BSP
On Casting of 12th Floor 7.5% of BSP
On Casting of 15th Floor  7.5% of BSP
On Casting of 18th Floor  7.5% of BSP
On Casting of Top Floor  7.5% of BSP
On Intimation of Possession 7.5% of BSP + All other charges
[B] Subvention (10:80:10) Plan
Particulars Percentage
On Booking 10% of Total Cost
On Bank Disbursement 80% of Total Cost
On Oer of Possession 10% of Total Cost
[C] Terms and Conditions
  • Service Tax, TDS, any other taxes, cess, duties, registration charges etc as applicable would be payable by the customer as per demand.
  • Development Charges (EDC+IDC) will be charged on pro-rated per unit as applicable to this Township/Group Housing Colony. The same shall be computed by developer and will be payable as per actual at the time of oer of possession.
  • Prices & Payment plans are subject to revision at sole discretion of Company.
  • Cheques/Bank Drafts to be issued in favour of 'Supertech Limited A/C Officer’s Enclave' payable at New Delhi.
[A] POSSESSION LINK PLAN :
Particulars Percentage
On Booking 10%
Within 30 Days 10%
Completion of 1st Floor 20%
On Possession 60%
[B] CONSTRUCTION LINK PAYMENT PLAN
Particulars Percentage
On Booking10% of BSP
After 60 days 20% of BSP
After 90 days 10% of BSP
On Casting of Ground Floor Slab 10% of BSP
On Casting of First Floor Slab 10% of BSP
On Casting of Second floor 10% of BSP
On Casting of Super structure 10% of BSP
On Completion of Brick Work & Plaster 10% of BSP
On Offer of Possession 10% of BSP + OTHER CHARGES

*In CLP plan Timely payment rebate of 3% on every payment made on or before time due, will be deducted from the installment.

[C] DOWN PAYMENT PLANN
Particulars Percentage
On Booking 10% of Total Cost
Within 45 Days 85% of Total Cost
On Offer of Possession 5% of Total Cost
Discount 10% on CLP Rates
[D] Terms and Conditions
  • Development Charges (EDC+ IDC] will be charged on pro-rated per Unit as applicable to this Township/Group Housing colony. In case of any revision, the same would be recovered on pro- rata basis from the Applicant/Allottee.
  • GST, TDS any other tax and cess as applicable would be payable by the customer as per demand.
  • Electricity Installation Charges, Maintenance Charges, Meter Connection Charges and other charges will be charged extra and shall be paid before the possession.
  • Prices subject to revision at the sole discretion of the Company.
  • Power Back up Charges is min 3 KW and additional load wilf be decided by the developer at the time of possession.
  • Cheques/Bank Drafts to be issued in favour of "SUPERTECH LIMITED A/C" payable at New Delhi. Outstation cheques shall not be accepted.
  • Total Cost is inclusive of all additional charges.
Progress Status
Tower/Block Current Status
Block 01 to 24 ---
Block 25 to 52 ---
Block E 01 to E20 ---
C-1 to C-2 Structure complete
C-3 to C-14 Top floor in progress.
C-15 to C-16 3rd floor completed & further work above 3rd floor in progress
C-17 to C-18 2nd  floor completed and 3rd floor in progress
C-19 to C-20 1st   floor completed & 2nd floor in progress
C-21 to C-24 2nd  floor completed and 3rd floor in progress
E-18 to E-21 1st   floor completed &2nd floor in progress
E-16 to E-17 stilt floor completed & 1st floor in progress
E-22 to E-29 Top floor in progress.
E-30 to E 31 3rd floor completed & further work above 3rd floor in progress
E-32 to E-33 2nd  floor completed &3rd floor in progress
E-62 to E-65 Top floor in progress.
J-59 to J-64 3rd floor completed & further work above 3rd floor in progress
J-65 to J-72 1st   floor completed &2nd floor in progress
J-73 2nd  floor completed &3rd floor in progress
J-74 to J-75 Excavation wok completed & Foundation  work in progress
N-77 to N-80 3rd floor completed & further work above 3rd floor in progress
N-81 to N-88 2nd  floor completed &3rd floor in progress
N-89 1st   floor completed &2nd floor in progress
N-90 to N-91 Excavation wok completed & Foundation  work in progress
N-372 to N-377 3rd floor completed & further work above 3rd floor in progress
N-378 to N-383 2nd  floor completed &3rd floor in progress
N-384 1st   floor completed &2nd floor in progress
N-385 Foundation completed & Stilt floor in progress
N-459 to N-474 stilt floor completed & 1st floor in progress
N-487 to N-490 1st   floor completed &2nd floor in progress
N-501 to N-506 stilt floor completed & 1st floor in progress
N-507 to N-510 Excavation wok completed & Foundation  work in progress
N-511 Construction work yet to be Started
N-512 Construction work yet to be Started
N-513 Construction work yet to be Started
L-01 to L-04 stilt floor completed & 1st floor in progress
L-05 to L-13 Excavation wok completed & Foundation  work in progress
L-341 1st   floor completed &2nd floor in progress
L-342 to L-343 2nd  floor completed &3rd floor in progress
L-344 to L-351 3rd floor completed & top floor in progress
L-352 to L-353 Top floor completed & Mumty work in progress
Enquiry Form

I am interested in this project

spacer
spacer
Location Map

FOR ENQUIRY, CALL +91-93100-12345
Menu
×

Dear Customer





For any Query/Input/Feedback, Please contact - crm@supertechlimited.com
Corporate Office : E Square, Plot No C2, Sector-96, Noida, Uttar Pradesh-201303
close
  //